DOI
10.21143/jhp.vol50.no4.2858
Abstract
Investment in the construction of nuclear power plants is an interesting investment. This is indicated by the emergence of investment plans for the construction of nuclear power plants in Indonesia. Communities and industries that make electricity a primary need will certainly welcome the potential energy offered by nuclear power plants. However, on the other hand the quality of NPP energy services must of course be maximized. This paper was made to provide a brief description of the management system requirements that need to be met by the NPP permit applicant along with additional best practices from the ISO 9001: 2015 standard related to the quality management system and ISO 50001: 2018 related to energy sector management systems. From the results of the analysis by comparing the BAPETEN Chairman Regulation No. 10 Year 2010 about Management System for Facilities and Activities with international standards it was concluded that there are still aspects of international standards that have not been met in regulations in Indonesia, such as supply chain management, inappropriate product control, continuous improvement, and communication with consumers. This can be a consideration for the preparation of further regulation.
References
Sunil Chopra dan Peter Meindl, Supply Chain Management Strategy, Planning, And Operation, Boston: Pearson, 2013
ISO 9000:2015, Quality management systems— Fundamentals and vocabulary, 2015
General Safety Requirements (GSR) IAEA Part 2, Leadership and Management for Safety, 2016 ISO 50001:2018, Energy Management System, 2018 ISO 9001:2015, Quality management systems — Requirements, 2015
Indonesia, Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 10 Tahun 2017 tentang Pokok-Pokok dalam Perjanjian Jual Beli Tenaga Listrik, Berita Negara Republik Indonesia Tahun 2017 Nomor 151
Indonesia, Undang-Undang Nomor 30 Tahun 2009 tentang Ketenagalistrikan, Lembaran Negara Republik Indonesia Tahun 2009 Nomor 133
Indonesia, Peraturan Kepala BAPETEN Nomor 4 Tahun 2010 tentang Sistem Manajemen Fasilitas Dan Kegiatan Pemanfaatan Tenaga Nuklir
Rancangan peraturan Badan Pengawas Tenaga Nuklir penggantiPeraturan Kepala BAPETEN Nomor 4 Tahun 2010 tentang Sistem Manajemen Fasilitas Dan Kegiatan Pemanfaatan Tenaga Nuklir, Jakarta
Indonesia, Undang-Undang Nomor 8 Tahun 1999 tentang Perlindungan Konsumen, Lembaran Negara Republik Indonesia Tahun 1999 Nomor 42
Recommended Citation
Cusmanri, Fery Putrawan
(2020)
"SISTEM MANAJEMEN MUTU PLTN DARI PERSPEKTIF REGULASI DI INDONESIA DAN STANDAR YANG BERLAKU,"
Jurnal Hukum & Pembangunan: Vol. 50:
No.
4, Article 7.
DOI: 10.21143/jhp.vol50.no4.2858
Available at:
https://scholarhub.ui.ac.id/jhp/vol50/iss4/7
Included in
Administrative Law Commons, Comparative and Foreign Law Commons, Constitutional Law Commons, Criminal Law Commons, Natural Resources Law Commons