Journal of Materials Exploration and Findings
Abstract
Geothermal Power Plant (GPP) use steam from geothermal reservoirs to produce electricity. Power Plants are one of the most dangerous work environments. The dangers that exist in the power generation process can be in the form of Major Accident Hazard (MAH) and have a large impact which can cause Major Accidents. Major Accident prevention can be done by managing Safety Critical Elements (SCE) as a control measure in the form of procedures to prevent or mitigate the risks. Each SCE has a Performance Standard that includes targets and thresholds set to reduce risk to reach ALARP (As Low as Reasonably Practicable) that will be used as a reference in Inspection, Testing and Preventive Maintenance programs to prevent Major Accidents. This research was conducted to identify SCE and establish Performance Standard for GPP PT XYZ with a capacity of 1x55 MW. Based on the identification results, it is known that the total MAH at GPP PT XYZ is 112. Each MAH was analyzed using a bow-tie diagram to obtain a total of 532 SCE or 8.12% of the total 6,549 existing equipment.
References
Ahmad, A C, Zin, I N M, Othman, M K & Muhamad, N H 2016, ‘Hazard Identification, Risk Assessment and Risk Control (HIRARC) Accidents at Power Plant’, MATEC Web of Conferences, vol. 66, pp. 1–6, doi: 10.1051/matecconf/20166600105.
Gutiérrez-negrín, L C 2012, Encyclopedia of Sustainability Science and Technology, Encyclopedia of Sustainability Science and Technology, January, Springer, doi: 10.1007/978-1-4419-0851-3.
International Organization for Standardization (ISO) 2016, ISO 17776: Petroleum and natural gas installations — Major accident hazard.
Ministry of Human Resources (MOHR), Department of Occupational Safety and Health 2020, Guidelines on Occupational Safety and Health (OSH) Risk Management for Small and Medium Enterprises, Available at: https://asean.org/storage/Guidelines-on-OSH-Risk-Management.pdf
Nenny, I & Saptadji, M 2001, Geothermal Engineering, ITB Press, Bandung..
Schwartz, T G 2014, ‘Critical Asset Performance Standards (CAPS) Development for Offshore Reliability’, Proceedings - Annual Reliability and Maintainability Symposium, pp. 1–6, doi: 10.1109/RAMS.2014.6798462.
Recommended Citation
Febriardy, Febriardy; Fatriansyah, Jaka Fajar; Endang, Endang; Bagaskoro, Farhan Iqbal; and Kurniawan, Ari
(2025)
"Identification Safety Critical Elements and Establish Performance Standards to Control Major Accident Hazard at The Geothermal Power Plant PT. XYZ,"
Journal of Materials Exploration and Findings: Vol. 4:
Iss.
3, Article 3.
DOI: 10.7454/jmef.v4i3.1072
Available at:
https://scholarhub.ui.ac.id/jmef/vol4/iss3/3