•  
  •  
 

Journal of Materials Exploration and Findings (JMEF)

Abstract

Assets life extension are required to predict the design life expiry based on condition and effects of deterioration. The remaining life assessment will answer the questions about timing of the component or equipment will lead to failure and shall be evaluated by inspection and maintenance monitoring. This study elaborates process calculation and analysis by using remaining life assessment and fitness for services method according to API 579-1/ASME FFS-1 for process piping area. The result of remaining useful life estimation and estimated life has been proposed. There are 11 piping systems based on the condition monitoring with thickness measurements. The result is 2 piping systems was not reached more than 20 years of age and continue to the assessment of fitness for service. The result for Inlet Naphtha 946-TK-5 piping systems is accepted for assessment level 1, both the result of evaluating average measured criteria and evaluating minimum measured thickness. The piping systems can continue the operation until the estimated life. Another result for Discharge Crude 946-P1AB to CDU piping systems was not accepted due to the minimum measured thickness not met the criteria. Hence, the piping systems is potentially unsafe with the given data during the lifetime.

References

[1] Sattari, F., Lefsrud, L., Kurian, D. and Macciotta, R., 2022. A theoretical framework for data-driven artificial intelligence decision making for enhancing the asset integrity management system in the oil & gas sector. Journal of Loss Prevention in the Process Industries, 74, p.104648.

[2] Ferreira, N.N., Martins, M.R., de Figueiredo, M.A.G. and Gagno, V.H., 2020. Guidelines for life extension process management in oil and gas facilities. Journal of Loss Prevention in the Process Industries, 68, p.104290.

[3] Antono, H., 2008. Assessment Hasill Inspeksi Menggunakan Fitness For Service Pada Fasilitas Produksi Oil dan Gas Line di Lepas Pantai di Laut Jawa. Universitas Indonesia.

[4] Caines, S., Khan, F. and Shirokoff, J., 2013. Analysis of pitting corrosion on steel under insulation in marine environments. Journal of Loss Prevention in the process Industries, 26(6), pp.1466-1483.

[5] Hartoyo, F., 2022. The Optimization Of Failure Risk Estimation On The Uniform Corrosion Rate With A Non-Linear Function. Journal of Materials Exploration and Findings (JMEF), 1(1), p.3.

[6] Fatriansyah, J.F., Dhaneswara, D., Hanifa, M., Hartoyo, F., Pradana, A.F., Anis, M. and Fauzi, A., 2023. Perancangan Program Pengestimasi Probabilitas Kegagalan Peralatan Penukar Panas Akibat Korosi Seragam Berbasis Deep Neural Network. Syntax Literate; Jurnal Ilmiah Indonesia, 8(3), pp.1827-1839.

[7] Rahim, Y., Refsdal, I. and Kenett, R.S., 2010. The 5C model: A new approach to asset integrity management. International Journal of Pressure Vessels and Piping, 87(2-3), pp.88-93.

[8] Haryadi, G.D., Suprihanto, A., Sephanya, A. and Haryanto, I., 2019. PENILAIAN RISIKO DAN PENENTUAN SISA UMUR TERHADAP PIPA GAS TEE 24" DI PT. X DENGAN MENGGUNAKAN METODE RISK BASED INSPECTION. ROTOR, 12(1), pp.1-4.

[9] Putra, I.F., Soedarsono, J.W., Mahendra, M., Haidir, Y., Purnawarman, F.D., Sukirna, I. and Hernowo, W., 2022. STRUCTURAL RISK-BASED UNDERWATER INSPECTION (RBUI) AS A COST REDUCTION OF FIELD’s END OF PRODUCTION LIFE. Journal of Materials Exploration and Findings (JMEF), 1(2), p.2.

[10] Bakhtiari, R., Zangeneh, S., Fotouh, M.B., Jamshidi, S.M. and Shafeie, A., 2017. Fitness for service assessment of a pressure vessel subjected to fire damage in a refinery unit. Engineering Failure Analysis, 80, pp.444-452.

[11] American Petroleum Institue (API) 579-1/ASME FFS-1, 2016. Fitness for Service.

[12] Tiggor, T.P. and Riastuti, R., 2022. Risk Management of Carbon Steel Piping in Sweet Environment Multiphase Fluid Production. Journal of Materials Exploration and Findings (JMEF), 1(2), p.4.

[13] Xu, X., Liang, Q. and Peng, C., 2022. Failure probability evaluation for a weld of the heat pipe in the Mega-Power heat pipe cooled reactor. Annals of Nuclear Energy, 177, p.109324.

[14] Lu, Y.J. and Wang, C.H., 2020. Effects of geometry of a local thin area defect on remaining strength and fitness of pressure equipment. Journal of Loss Prevention in the Process Industries, 65, p.104125.

[15] Wasim, M. and Djukic, M.B., 2022. External corrosion of oil and gas pipelines: A review of failure mechanisms and predictive preventions. Journal of Natural Gas Science and Engineering, p.104467.

[16] American Petroleum Institute (API) 570, 2016. Piping Inspection Code: Inspection, Repair, Alteration, and Rerating of In-service Piping Systems.

[17] Ramírez-Ledesma, A.L. and Juarez-Islas, J.A., 2022. Modification of the remaining useful life equation for pipes and plate processing of offshore oil platforms. Process Safety and Environmental Protection, 157, pp.429-442.

[18] American Society of Mechanical Engineers, 2018. Process Piping: ASME Code for Pressure Piping, B31. American Society of Mechanical Engineers.

[19] API Recommended Practice 581, 2016. Risk-Based Inspection Methodology. Am. Pet. Inst., no. April 2016.

[20] Animah, I. and Shafiee, M., 2018. Condition assessment, remaining useful life prediction and life extension decision making for offshore oil and gas assets. Journal of loss prevention in the process Industries, 53, pp.17-28.

[21] Dobis, J.D., Cantwell, J.E. and Prager, M., 2004. Damage mechanisms affecting fixed equipment in the refining industry. Welding Research Council Bulletin, (489).

[22] Wang, Y., Zhang, W., Wang, Y., Siefert, J., Bridges, A., Kung, S. and Feng, Z., 2022. Remaining lifetime assessment of 141,000-hour service-aged forge 91-pipe 91 steel header welds with novel in-situ digital image correlation. Materials & Design, 222, p.111102.

[23] Zhang, S., Yan, Y., Wang, P., Xu, Z. and Yan, X., 2019. Sustainable maintainability management practices for offshore assets: A data-driven decision strategy. Journal of Cleaner Production, 237, p.117730.

[24] Song, J.S., Lok, V., Yoon, K.B., Ma, Y.W. and Kong, B.O., 2021. Quantitative risk-based inspection approach for high-energy piping using a probability distribution function and modification factor. International Journal of Pressure Vessels and Piping, 189, p.104281.

[25] Vasilev, M., MacLeod, C., Javadi, Y., Pierce, G. and Gachagan, A., 2021. Feed forward control of welding process parameters through on-line ultrasonic thickness measurement. Journal of Manufacturing Processes, 64, pp.576-584.

[26] Ali, A., Kumar, A., Kumar, K., Murthy, Y.R.C., Ravinder, B., Kapoor, K. and Babu, C.P., 2019. Ultrasonic testing as alternative for radiography for evaluation of PFBR blanket pin end plug weld integrity. Procedia Structural Integrity, 14, pp.273-281.

[27] Deepak, J.R., Raja, V.B., Srikanth, D., Surendran, H. and Nickolas, M.M., 2021. Non-destructive testing (NDT) techniques for low carbon steel welded joints: A review and experimental study. Materials Today: Proceedings, 44, pp.3732-3737.

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.